⚙️ Prd V08 Release Planning

This skill converts EPICs into production-ready DEP- entries by defining environments, release criteria, rollback triggers, and validation steps.

QUICK INSTALL
npx playbooks add skill mattgierhart/prd-driven-context-engineering --skill prd-v08-release-planning

Prd V08 Release Planning instructions

Release Planning

Position in workflow: v0.7 Implementation Loop → v0.8 Release Planning → v0.8 Runbook Creation

Execution Mode

Default is standard. See [.claude/rules/08-skill-execution-modes.md](../../rules/08-skill-execution-modes.md) for selection logic.

| Mode | What this skill produces |
|------|--------------------------|
| quick | Staging→prod only; 3–5 release criteria; one rollback trigger |
| standard | Dev/staging/preview/prod environments; full criteria checklist; multiple rollback triggers; post-deploy validation |
| deep | Full environments + IaC review + canary/blue-green strategy + risk-weighted criteria + post-mortem hooks |

Consumes

This skill requires prior work from v0.7 Implementation Loop and v0.6-v0.9:

  • **EPIC-\* completed entries** (from v0.7 Implementation Loop) — Finished work packages define what's being released; must have State=Complete, all TEST- passing
  • **TEST-\* test entries** (from v0.7 Test Planning) — All TEST- must pass in staging before release criteria can be met
  • **API-\* endpoint contracts** (referenced in EPIC Context & IDs) — Define SLA and performance baselines for release criteria
  • **ENV-\* environment specifications** (from v0.6 Environment Setup) — Local/CI/CD/production configurations inform DEP- entries for each environment
  • **ARC-\* architecture decisions** (from v0.6 Architecture Design) — System structure (monolith, microservices, deployment topology) drives environment setup
  • **TECH-\* technology stack** (from v0.5 Technical Stack Selection) — Technology choices inform infrastructure requirements and deployment tooling
  • **RISK-\* high-priority entries** (from v0.5 Risk Discovery) — High RISK- must be mitigated or explicitly accepted before release
  • **KPI-\* metrics** (from v0.3 and v0.9) — Target KPI values inform monitoring baselines and rollback thresholds

This skill assumes v0.7 Implementation is complete with all EPIC- entries marked Complete and all TEST- passing.

Produces

This skill creates/updates:

  • **DEP-\* entries** (deployment specifications, environment/criteria/rollback/validation types) — Release readiness checklist with environment configs, go/no-go criteria, rollback triggers and thresholds, post-deploy validation steps
  • Release readiness checklist — Pre-deploy validation matrix showing which DEP- criteria must be met before release proceeds
  • Rollback decision tree — Mapping of DEP- rollback triggers to execution procedures and escalation paths (feeds v0.8 Runbook Creation)

All DEP- entries are operational contracts, not confidence-based. They are:

  • Environment-specific (each environment from staging to production has defined configuration)
  • Verifiable (each criterion has a concrete check or metric threshold)
  • Enforceable (release stops if DEP- criteria not met)
  • Traceable (each DEP- links to EPIC-, TEST-, API-, KPI- that validate it)

Example DEP- entries:

DEP-001: Production Environment Configuration
Type: Environment
Stage: Pre-deploy

Description: AWS production environment setup for application
Name: production
Infrastructure: AWS us-east-1, ECS Fargate, RDS PostgreSQL
Configuration:
  - NODE_ENV=production
  - LOG_LEVEL=info
  - RATE_LIMIT=100/min
  - METRICS_COLLECTION=enabled
Secrets: AWS Secrets Manager, rotated monthly
Access: DevOps team (deploy), On-call (read-only access)

Linked IDs: ARC-001 (monolith structure), TECH-005 (AWS)

---

DEP-002: All Tests Pass in Staging
Type: Criteria
Stage: Pre-deploy

Description: Complete test suite must pass in staging environment before production release
Requirement: All TEST- entries pass with >95% success rate, including smoke tests and E2E tests
Verification: CI/CD pipeline reports green; test report generated and reviewed
Blocker: Yes — Release cannot proceed if this fails
Owner: QA Lead

Linked IDs: TEST-001 to TEST-050 (from EPIC-01 through EPIC-07)

---

DEP-003: Error Rate Rollback Trigger
Type: Rollback
Stage: Post-deploy

Description: Automatic rollback if error rate exceeds baseline post-deployment
Trigger: 5xx error rate exceeds pre-deployment baseline
Threshold: >2% of requests for 5 minutes (currently 0.5% baseline from MON-001)
Procedure:
  1. Alert on-call engineer (PagerDuty)
  2. Pause traffic to new version
  3. Revert to pre-deploy git tag
  4. Investigate root cause
Notification: #incidents Slack, PagerDuty, Engineering Lead

Linked IDs: MON-001 (error rate metric), RUN-002 (rollback procedure), API-001–020 (endpoints affected)

---

DEP-004: Post-Deployment Smoke Tests
Type: Validation
Stage: Post-deploy

Description: Automated smoke tests to verify critical user journeys work post-deployment
Check: All critical UJ- (UJ-000, UJ-001, UJ-005, UJ-010) complete successfully
Method: Automated (tests/e2e/smoke.spec.ts) + manual spot-check
Success Criteria: All journeys complete <2 seconds, no auth failures, data persists
Escalation: If smoke tests fail, execute DEP-003 rollback and investigate

Linked IDs: UJ-000/001/005/010 (critical journeys), TEST-050 (E2E suite)

Core Concept: Release as Contract

> A release is not "code that works locally." It is a contract between development and operations—a formal handoff that includes everything needed to deploy, validate, and recover.

Release Components

| Component | Purpose | Output |
|-----------|---------|--------|
| Deployment Environment | Where code runs | DEP- (environment config) |
| Release Criteria | What must be true to deploy | DEP- (checklist) |
| Rollback Triggers | When to revert | DEP- (conditions) |
| Validation Steps | How to verify success | DEP- (post-deploy checks) |

Execution

  1. Inventory completed EPICs
  • Which EPIC- entries are "Complete"?
  • What API-, DBT-, FEA- are included in this release?
  1. Define deployment environments
  • Staging, Production, Preview
  • Environment-specific configurations
  • Secrets management approach
  1. Establish release criteria
  • All TEST- pass in staging
  • Performance baselines met (from MON-)
  • No critical RISK- blockers
  • Security review complete
  1. Define rollback triggers
  • Error rate thresholds
  • Latency thresholds
  • User-reported critical issues
  • Data integrity concerns
  1. Document validation steps
  • Post-deployment smoke tests
  • Key journey verification (UJ-)
  • Metric baseline confirmation
  1. Create DEP- entries with full traceability

DEP- Output Template

DEP-XXX: [Deployment Item Title]
Type: [Environment | Criteria | Rollback | Validation | Step]
Stage: [Pre-deploy | Deploy | Post-deploy | Rollback]

Description: [What this deployment item covers]

For Environment Type:
  Name: [staging | production | preview]
  Infrastructure: [Cloud provider, region, resources]
  Configuration: [Environment-specific settings]
  Secrets: [How secrets are managed]
  Access: [Who can deploy, who can access]

For Criteria Type:
  Requirement: [What must be true]
  Verification: [How to check this]
  Blocker: [Yes | No] — Does failure block deploy?
  Owner: [Who verifies]

For Rollback Type:
  Trigger: [What condition initiates rollback]
  Threshold: [Specific metric or condition]
  Procedure: [How to execute rollback]
  Notification: [Who to alert]

For Validation Type:
  Check: [What to verify post-deploy]
  Method: [Manual | Automated | Both]
  Success Criteria: [Expected result]
  Escalation: [What if validation fails]

Linked IDs: [EPIC-XXX, API-XXX, TEST-XXX related]

Example DEP- entries:

DEP-001: Production Environment Configuration
Type: Environment
Stage: Pre-deploy

Description: AWS production environment setup for main application

Name: production
Infrastructure: AWS us-east-1, ECS Fargate, RDS PostgreSQL
Configuration:
  - NODE_ENV=production
  - LOG_LEVEL=info
  - RATE_LIMIT=100/min
Secrets: AWS Secrets Manager, rotated monthly
Access: DevOps team (deploy), On-call (read-only)

Linked IDs: ARC-001, TECH-005
DEP-002: All Tests Pass in Staging
Type: Criteria
Stage: Pre-deploy

Description: Complete test suite must pass in staging environment

Requirement: All TEST- entries pass with >95% success rate
Verification: CI/CD pipeline green status, test report review
Blocker: Yes
Owner: QA Lead

Linked IDs: TEST-001 to TEST-050
DEP-003: Error Rate Rollback Trigger
Type: Rollback
Stage: Post-deploy

Description: Automatic rollback if error rate exceeds threshold

Trigger: 5xx error rate exceeds baseline
Threshold: >2% of requests for 5 minutes
Procedure:
  1. Alert on-call engineer
  2. Pause traffic to new version (if canary)
  3. Revert to previous known-good version
  4. Investigate root cause
Notification: #incidents Slack, PagerDuty

Linked IDs: MON-001, RUN-005

Environment Progression

| Stage | Environment | Purpose | Gate |
|-------|-------------|---------|------|
| 1 | Development | Engineer testing | Tests pass locally |
| 2 | Staging | Integration testing | All TEST- pass |
| 3 | Preview | Stakeholder review | Sign-off from PM |
| 4 | Production | Live users | All DEP- criteria met |

Release Criteria Categories

| Category | Examples | Priority |
|----------|----------|----------|
| Functional | Tests pass, features work | Must-have |
| Performance | Latency <200ms, throughput >100rps | Must-have |
| Security | No critical vulns, secrets rotated | Must-have |
| Operational | Runbooks ready, monitoring active | Should-have |
| Documentation | Release notes, API docs updated | Should-have |

Rollback Strategy Patterns

| Pattern | When to Use | Complexity |
|---------|-------------|------------|
| Blue-Green | Need instant rollback, can afford 2x infra | Medium |
| Canary | Gradual rollout, catch issues early | High |
| Rolling | Zero-downtime, standard approach | Low |
| Feature Flags | Decouple deploy from release | Medium |

Anti-Patterns

| Pattern | Signal | Fix |
|---------|--------|-----|
| Deploy and pray | No validation steps defined | Add DEP- validation entries |
| Manual everything | No automation, error-prone | Automate repeatable steps |
| No rollback plan | "We'll figure it out" | Define triggers and procedures upfront |
| Environment drift | Staging doesn't match production | Infrastructure as code, sync configs |
| Missing criteria | "It works on my machine" | Formal DEP- criteria checklist |
| Unclear ownership | No one knows who approves | Assign owner to each DEP- |

Quality Gates

Before proceeding to Runbook Creation:

  • [ ] All deployment environments documented (DEP- Environment type)
  • [ ] Release criteria defined with clear blockers (DEP- Criteria type)
  • [ ] Rollback triggers specified with thresholds (DEP- Rollback type)
  • [ ] Post-deploy validation steps defined (DEP- Validation type)
  • [ ] Each DEP- entry has an owner
  • [ ] Criteria trace back to EPIC-, TEST-, API- IDs

Downstream Connections

| Consumer | What It Uses | Example |
|----------|--------------|---------|
| Runbook Creation | DEP- rollback procedures become runbook inputs | DEP-003 → RUN-005 |
| Monitoring Setup | DEP- thresholds inform alerting | DEP-003 (2% error) → MON-001 |
| v0.9 GTM Strategy | Release readiness gates launch | All DEP- met → GTM-001 |
| EPIC- Future Releases | DEP- becomes template for next release | DEP-001 reused |

Detailed References

  • Environment configuration examples: See references/environment-examples.md
  • DEP- entry template: See assets/dep-template.md
  • Rollback procedure guide: See references/rollback-guide.md

Related Skills

Get the best new skills
in your inbox

Weekly roundup of top Claude Code skills, MCP servers, and AI coding tips.